Haku
- Fess-haku
Näytetään tulokset 1 - 15 / 15
-
Squadron 2020 The Squadron 2020 combat vessel project is the Defence Forces’ strategic capability project. For Finland’s defence capability the project is significant. The project to replace the Navy’s combat vessels was launched in 2015, and an i...https://merivoimat.fi/en/squadron-2020
-
21.5.2026 | The second Pohjanmaa-class multi-role corvette to be built for the Navy has been launched in Rauma. The vessel was moved from the construction hall to the dock basin where the building and outfitting of the vessel will continue. A festive launch ceremony was celebrated in Rauma on 21 May.https://merivoimat.fi/en/-/the-second-pohjanmaa-class-multi-role-corvette-launched
-
Navy Command National authority for maritime defence. Lue lisää Navy Command Naval Commanders from the Baltic Sea region met in Turku Navy 13.3.2026 The aim of the conference was to strengthen dialogue and cooperation between maritime actors in th...https://merivoimat.fi/en/navy-command
-
20.4.2026 | The Government Defence Report (VNS 2024) mentions the modernisation of minesweeping capabilities of contact and influence mines, which is set to begin with replacing the ageing Kuha and Kiiski class vessels. The vessels were built in the 1970s and 1980s, and extending their life cycle is no longer cost-effective.https://merivoimat.fi/en/-/developing-the-navy-s-minesweeping-capability-to-meet-the-needs-of-the-2030s
-
Finnish Navy The Finnish Navy has three statutory tasks related to the military defence of Finland: the surveillance of our territorial waters, repelling of territorial violations and maritime attacks, and protecting sea lines of communication. Th...https://merivoimat.fi/en/about-us
-
2.4.2026 | For several years, the Navy has been developing a comprehensive capability to produce virtual exercises to train soldiers with better skills. This time, the Navy is piloting a procedure exercise for the virtual training environment for trainees to practise situations involving damages on a vessel in a setting that simulates reality.https://merivoimat.fi/en/-/practising-real-life-situations-in-a-virtual-training-environment
-
26.5.2026 | Norway has signed the Common Armoured Vehicle System (CAVS) Framework Agreement which allows serial procurement of CAVS 6x6 vehicles. The CAVS Framework Agreement has been already signed between Finland, Latvia, Sweden, Germany and Denmark.https://merivoimat.fi/en/-/1948673/norway-joins-cavs-procurement-framework-agreement
-
22.5.2026 | The Finnish Air Force conducted an evaluation of a cyber team composed of active-duty personnel and reservists together with the Virginia Air National Guard in April 2026.https://merivoimat.fi/en/-/1951206/finnish-air-force-cyber-team-successfully-completes-evaluation-in-the-united-states
-
13.3.2026 | The Baltic Commanders Conference brought together the Commanders of Naval Forces of the Baltic Sea region, as well as Commanders of the NATO's Maritime Command and of the CTF Baltic in Turku 10 – 12 of March 2026.https://merivoimat.fi/en/-/naval-commanders-from-the-baltic-sea-region-met-in-turku
-
21.5.2025 | The first of the Pohjanmaa-class multi-role corvettes to be built for the Navy has been launched in Rauma. In early May, the vessel was moved from the construction hall to the dock basin where the building and outfitting of the vessel continue. A festive launch ceremony was celebrated in Rauma on 21 May.https://merivoimat.fi/en/-/first-pohjanmaa-class-corvette-launched-in-rauma
-
9.10.2024 | Rauma Marine Constructions (RMC Defence) has started the construction of the second multi-role corvette included in the Squadron 2020 project. Today, the 9th of October, the cutting of the steel structures for the hull of the second vessel of the Squadron started in the presence of invited guests in Rauma.https://merivoimat.fi/en/-/construction-of-the-second-pohjanmaa-class-corvette-launched-in-rauma
-
11.4.2024 | The building of the first multi-purpose corvette included in the Squadron 2020 project has advanced to the keel laying phase. A traditional keel laying ceremony was celebrated at Rauma shipyard on Thursday 11 April 2024.https://merivoimat.fi/en/-/keel-of-the-first-pohjanmaa-class-corvette-was-laid
-
19.9.2019 | The procurement decision of the strategic Squadron 2020 project, the Pohjanmaa Class multi-role corvettes, was approved in the Government Plenary Session on 19 September.https://merivoimat.fi/en/-/laivue-2020-hankkeen-hankintapaatos-hyvaksytty-uudet-pohjanmaa-luokan-korvetit-vahvistavat-merivoimien-suorituskykya
-
26.9.2019 | The contracts concerning the Defence Forces’ strategic project, the procurement and construction of the Pohjanmaa Class combat vessels were signed in Turku on Thursday 26 September 2019. The Finnish Defence Forces Logistics Command, Rauma Marine Construction Oy, Saab Ab and the Finnish Navy participated in the signing of the contracts.https://merivoimat.fi/en/-/pohjanmaa-luokan-korvettien-sopimukset-allekirjoitettiin-turussa
-
17.12.2020 | The year of the Navy’s Katanpää-class mine countermeasures vessels in the NATO Response Force’s Follow on Forces pool will come to an end on 31 December 2020. Nyland Brigade's coastal jaeger troops' period in the same pool will end at the same time.https://merivoimat.fi/en/-/year-on-nrf-rotation-for-the-katanpaa-class-more-than-just-maintaining-readiness